VisitCanalPanama.com Panama Canal tours
A container ship in the Miraflores Locks of the Panama Canal

Independent Panama Canal travel guide

Panama Canal Map and Locks

The Panama Canal is about 50 miles long and lifts ships to Gatún Lake and back down again. This page shows the map, names every lock and explains how the route and the water limits work.

  • ★ Hand-picked, top-rated tours
  • ⚓ Locks and transits explained
  • ↺ Free cancellation on most bookings

Panama Canal map: the route in one picture

The canal connects the Atlantic and the Pacific across Panama. It is about 50 miles (80 km) long. It is not a sea level cut. Ships are lifted in locks to Gatún Lake, which sits about 85 feet (26 m) above sea level, cross the lake and are lowered again on the other side. The 26 m is the height of the lake, not a constant height difference between the two oceans.

The map shows the locks, the lakes and the ports. Use it with the list below to follow a ship from one ocean to the other.

about 50 miles80 km from ocean to ocean
5 lock complexes3 original, 2 added in 2016
about 85 feet26 m, the height of Gatún Lake
Map of the Panama Canal with locks, lakes and ports

All Panama Canal locks

Three original lock complexes and two from the expansion.

LockSideRouteTypeCan you visit?
MirafloresPacificOriginalLocomotivesYes, visitor center
Pedro MiguelPacificOriginalLocomotivesFrom a boat on a partial transit
GatúnAtlanticOriginalLocomotivesYes, via the Agua Clara ticket office
CocolíPacificExpandedTugs–
Agua ClaraAtlanticExpandedTugsYes, visitor center

Miraflores and Agua Clara have visitor centers. For Gatún, the canal authority offers access with a ticket bought at the Agua Clara ticket office. For Pedro Miguel and Cocolí no visitor access is listed. A partial transit by boat takes you through Miraflores, Pedro Miguel and the Culebra Cut.

The route, lock by lock

From the Pacific to the Atlantic.

Original route

Pacific entrance, then Miraflores Locks, Miraflores Lake, Pedro Miguel Locks, the Culebra Cut, Gatún Lake, Gatún Locks and the Atlantic. A ship uses all three original lock complexes in this order.

Expanded route

The new route uses Cocolí on the Pacific side and Agua Clara on the Atlantic side. A ship on this route does not go through Miraflores, Pedro Miguel or Gatún. It still crosses Gatún Lake.

Not a chain of five

No ship passes all five lock complexes one after another. Each ship takes either the original or the expanded route.

Culebra Cut

This is the cut between Pedro Miguel and Gatún Lake. A boat trip on a partial transit goes through it and passes the Centennial Bridge.

Panama Canal tours and lock visits

See the locks from the shore or from a boat, with live prices and availability.

Browse all tours on GetYourGuide →

How the Panama Canal locks work

A lock is a chamber with gates at both ends. A ship enters, the gates close behind it, and the water level in the chamber is changed until it matches the next level. Then the front gates open and the ship moves on. The same steps lift a ship up to Gatún Lake and lower it again on the other side.

In the original locks, locomotives on the lock walls hold the ship in the middle of the chamber. In Cocolí and Agua Clara, tugs do this work. That is why you see both in photographs and why the two kinds of lock look different.

The canal depends on rain in its watershed. This is why low rainfall leads to limits on ships, as explained below.

A tug and a cargo ship entering a lock chamber

The expansion of 2016

Agua Clara and Cocolí opened on 26 June 2016. They give the canal a third lane for larger ships. The original locks were not replaced and are still in use. This is the reason there are two routes on the map.

The new locks use tugs instead of locomotives. The history of the project is on the history page.

The Cocolí Locks on the Pacific side

Water, draft limits and daily transits

The limits have changed several times. The latest known state is from 28 September 2026.

DateMeasureStatus
December 202322 daily transits, 24 from 16 January 2024Past, drought period
August 2024Draft back to 50 feet (15.24 m), 36 slots from 1 September 2024Past, recovery
September 2026Draft cut to 48 feet (14.63 m) from 2 September, 47.5 feet (14.48 m) from 1 October announcedReplaced
From 15 October 202633 slots a day, 10 of them Neopanamax, draft 49 feet (14.94 m)Latest known, until further notice

The canal authority says the water deficit remains and that ships without a reservation can face delays. The old figures show how the situation developed, but they are not the current state. Do not assume today's limits from them.

For visitors, this does not mean closed locks. A limit on draft or slots does not by itself cancel a boat tour or a cruise. See cruises and the visitor centers for what to check.

Panama Canal map and locks: frequently asked questions

How long is the Panama Canal?

About 50 miles (80 km) between the Atlantic and the Pacific.

How many locks does the canal have?

Five lock complexes: Gatún on the Atlantic side, Pedro Miguel and Miraflores on the Pacific side, plus Agua Clara and Cocolí from the 2016 expansion.

Does a ship go through all five locks?

No. A ship uses either the three original lock complexes or the two expanded ones, not all five in a row.

How high does the canal lift a ship?

To Gatún Lake, which is about 85 feet (26 m) above sea level. This is not a constant height difference between the oceans.

How long does a transit take?

A ship needs 8 to 10 hours on average. A tourist day trip is a different product and has its own schedule.

Is the canal affected by low water?

Yes. From 15 October 2026 it allows 33 transits a day and a maximum Neopanamax draft of 49 feet (14.94 m). The canal is not closed.

Go through the locks yourself

Partial transit boat tours run on set days only. Compare canal tours with free cancellation.

Find your canal tour →